Customer & Project
|
Description of Work
|
|
U.S. Army Corps of Engineers, Omaha District
Air Force Space Command Building 1
|
Design-build retrofit of existing space command building; 27 separate security clearances throughout command center. 20% of communications upgrade is for TSSCI and higher networks. Replace 120/208 volt distribution system in 282,000 square foot (30-story) secure facility. Replacing communications cabling to facilitate 1,400 cubicles.
|
|
Colorado Springs Utilities
Birdsall Cooling Tower Reversing Switchgear
|
Design-build replacement of manual double-throw switch with electro-mechanical reversing gear for 20 knife switches (40 horsepower motors) with contactors in new enclosures. Maintain all existing controls. Mechanical upgrade, power plant, cooling tower and motor controls.
|
|
The Children's Hospital
Medical Office Building
|
50,000 square foot tenant improvement for a children's medical clinic. Project included: medical, tenant finish, MRI, fluoroscopy, X-ray rooms, fire alarm, generator, grounding, and mechanical upgrade.
|
|
U.S. Army Corps of Engineers, Omaha District
Evans Army Hospital Recovery Alterations
|
Electrical power lighting and fire alarm for pre- & post-surgical patients as well as behavioral health center in-patient care. Systems installed include: card access, CCTV, nurse call and fire alarm. Scope included primary sub-station installation for mechanical upgrade at central utility plant.
|
|
U.S. Army Corps of Engineers, Omaha District
Fort Carson 18 Building HVAC Upgrade
|
Electrical support for the replacement of cooling equipment at 18 buildings on the Fort Carson Army Base. Project included: design-assist, remodel, automation, controls, lightning protection, mechanical upgrade and motor connections.
|
|
U.S. Army Corps of Engineers, Omaha District
FY10 Company Brigade Central Operations Facility
|
55,000 square foot construction of a four (4) company brigade COF at Fort Carson, Colorado. Systems consist of power distribution system, lighting, fire alarm, lightning protection, security system and a 25 KW photovoltaic system. Our Voice/Data/Video department scope of work consists of interior tele/data system, cabling for CATV, outside plant cabling and fiber optic services for the building.
|
|
Flynn Properties
Garden of the Gods Storage
|
New 48,000 square foot design-build self-storage facility for large recreational vehicles. Project included: warehouse, grounding, primary and secondary service, no sub-contracting work.
|
|
Kindred Health Care 2011Power Upgrades
|
Upgrade 1,200 amp single phase service to 1,200 amp 3 phase service, add 4 sub-panels and run power for 66 PTAC units. Project included: nursing home, design-build, remodel, generator, secondary power, mechanical and power upgrades.
|
|
Colorado Springs Utilities
Martin Drake Power Plant Unit #5
|
Unit #5 industrial cooling tower rebuild for city utilities company. Scope of project included: Lightning protection, power plant, electrical generation, cooling tower, motor connections and motor controls.
|
|
Memorial Hospital
Paralleling Switchgear
|
Provide and install generator paralleling gear at operating hospital. Project scope of work includes: bed tower, controls, generator and power upgrade.
|
|
United States Air Force (Automated Logic Systems)
Peterson Air Force Base Clinic Controls
|
Replacement and upgrade of HVAC controls for an Air Force Base Medical Clinic. Project included: remodel, controls and structured cabling.
|
|
United States Air Force (Carrier)
Peterson Air Force Base Clinic
|
HVAC design-assist retrofit for medical facility at Peterson Air Force Base. Project was a government remodel which included a mechanical upgrade and installation of a fire alarm system.
|
|
Sun Share
Real Goods Solar Garden
|
Installation of a 575KW photovoltaic System. The system included power from and new 3phase 800 amp service, installation of the inverter and the tie in of 29 photo-voltaic arrays that included a total of 2,520 panels. This project was a design-assist new construction.
|
|
U.S. Army Corps of Engineers, Omaha District
Renovate Generator #1 Building 1860
|
Project was a government/military remodel which included automation, controls, mechanical upgrade, power upgrade and boiler wiring.
|
|
U.S. Army Corps of Engineers, Omaha District
Soldier Family Care and Behavioral Health Clinics
|
Addition of government administrative offices for two existing health clinics at the Fort Carson Base, Colorado. New construction additions included: telephone system, fire alarm, grounding, primary, secondary, security, site lighting and tele/data.
|
|
U.S. Army Corps of Engineers, Omaha District
SRM Building 1860 Boiler #1 Replacement
|
Government facilities boiler replacement in Building 1860 on Fort Carson military base. Project includes: automation, controls, mechanical and power upgrades, boiler wiring and motor connections.
|
|
United States Olympic Committee
U.S. Olympic Training Center - Building 85 Fire Alarm Upgrade
|
Replace existing fire alarm system with an upgraded system; scope including dormitory, design-assist, remodel, kitchen and nonprofit.
|
|
United States Olympic Committee
U.S. Olympic Training Center - Buildings 8,9 & 10 Fire Alarm Upgrade
|
Replace existing fire alarm system with an upgraded system; scope including dormitory, design-assist, remodel, kitchen and nonprofit.
|
|
TolTest
Miscellaneous Petroleum Oils and Lubrication
|
Design-assist retrofit of existing bulk diesal and bulk JP-8 (jet propulsion) yard, interfacing with 150,000 gallon jet fuel storage tank at Peterson Air Force Base, Colorado. Primary, secondary, mech and power upgrades, motor connections and motor controls.
|